Tenderfy

Framework agreement for cost calculations and uncertainty analysis.

Hankija
Oslo kommune v/ Eiendoms- og byfornyelsesetaten
Avaldatud
2026-10-26
Tähtaeg
2026-11-16T11:00:00+00:00
Allikad
TED
Väärtus
12000000.0 NOK

Kirjeldus

Kirjeldus on allika keeles.

The aim of the framework agreement is to cover the agency's ongoing need for external assistance regarding calculation of costs with uncertainty analyses, connected to the development of public infrastructure. There will mainly be grey-blue-green measures, such as streets, pedestrian and footpaths, footpaths, squares, parks and footbridges, streams and surface water systems that shall be cost calculated. However, there can also be cases where the infrastructure measures below the ground are cost calculated, such as other water and sewage systems and measures such as moving power lines. Some other types of cost calculation assignments can occur.

CPV: 71242000, 71244000, 71311300, 71320000

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe