Tenderfy

Intention notice - renovation of elevated basin - Pool South, Sola municipality

Hankija
Sola kommune
Avaldatud
2026-10-21
Tähtaeg
Pole esitatud
Allikad
TED
Väärtus
Pole esitatud

Kirjeldus

Kirjeldus on allika keeles.

Sola municipality intends to sign a contract with W. Giertsen Vannteknologi AS for rehabilitation of an elevated basin - Basseng Sør, Sola municipality. A drinking water approved membrane and steel quality shall be used in the renovation of the elevated basin. From what the Contracting Authority is aware of, there are not others who offer such a form of rehabilitation with the help of an objection membrane of a double pool.

CPV: 45232153, 45232154

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe