New tender for an extension to Causeway Comprehensive School Kerry
- Hankija
- Kerry Education and Training Board
- Avaldatud
- 2026-10-18
- Tähtaeg
- 2026-11-16T11:00:00+00:00
- Allikad
- TED
- Väärtus
- 9000000.0 EUR
Kirjeldus
Kirjeldus on allika keeles.
The project comprises the Construction of a new two storey extension to the existing school (1,753m2), containing classrooms, science rooms, home economics, music room, design and comm graphics room, ancillary rooms and Special Needs Unit along with all associated siteworks and abnormal works. The contractor must familiarise themselves with the Architects phasing drawing.
CPV: 45214200, 45214220, 45214230
Liikmesus
Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.