Tenderfy

Weinfelden and Müllheim Hydropower Plants – General Planning Services

Hankija
Wasserkraftwerke Weinfelden AG (DÜNNENBERGER Projektentwicklung GmbH)
Avaldatud
2026-10-23
Tähtaeg
2026-10-27T17:00:00+00:00
Allikad
CH_SIMAP
Väärtus
Pole esitatud

Kirjeldus

Kirjeldus on allika keeles.

<p>The subject of the procurement is the interdisciplinary general planning services for the further design and implementation of the Weinfelden and Müllheim hydropower plants in the Canton of Thurgau.</p><p><br></p><p>The procurement is carried out jointly by <strong>Wasserkraftwerke Weinfelden AG</strong>, <strong>Thurkraftwerk AG</strong> and <strong>Isento Wasserkraft AG</strong>.</p><p><br></p><p>The mandate includes, in particular, the construction of the new hydropower plants, the restoration of fish passage, hydraulic engineering works, the dismantling of existing power plants and canal facilities, as well as the restoration of the affected areas and watercourses.</p><p><br></p><p>The procurement comprises two project lots:</p><ul><li><strong>Lot 1 – Weinfelden Hydropower Plant:</strong> Contracting authority Wasserkraftwerke Weinfelden AG, general planning services for phases 32–53</li><li><strong>Lot 2 – Müllheim Hydropower Plant:</strong> Contracting authorities Thurkraftwerk AG and Isento Wasserkraft AG, general planning services for phases 31–53</li></ul><p><br></p><p>Applications and tenders must cover both project lots. It is intended to award both project lots to the same general planner. A separate general planning contract will be concluded for each project lot.</p>

CPV: 71300000

Liikmesus

Teadete eelvaated on tasuta. Ametlike teadete ja dokumentide lingid, ehitusload ning isiklik MCP juurdepääs nõuavad aktiivset tasulist liikmesust.

Loe