Tenderfy

Installation of new dust LEV in Coxon F028

Comprador
CENTRE FOR PROCESS INNOVATION LIMITED
Publicado
2026-11-20
Plazo
No indicado
Fuentes
UK_FTS
Valor
No indicado

Descripción

La descripción está en el idioma de la fuente.

As part of a previous Lab Refurbishment programme, a dust extraction system was installed in Coxon’s F028 laboratory in 2025. When commissioning connected equipment to the installed dust extract system, a loss of LFP powder was realised into the extract duct, which coincided with an over pressurisation of the duct from a connected vac pump causing LFP powder to exit at several joints contaminating the laboratory environment. At this time, CPI had separately engaged a 3rd party consultant, Mechon Limited, for a wider review of extract systems across CPI’s estate. Following the loss of containment, Mechon were engaged to expedite the review the affected Laboratories as a matter of priority. This review has resulted in a detailed specification of work and design package being produced. The provided Mechon Design and Specification is to be ultimately referenced and is required to correct the loss of containment and return F028 and F029 laboratories to service. Later works, not covered by this contract, will encompass non-critical long-term redesign of the system.

Suscripción

Consulte gratis el resumen de cada anuncio. Los enlaces al anuncio oficial y sus documentos, los permisos de construcción y el acceso MCP personal requieren una suscripción de pago activa.

Leer