Engineering Stage 5 (ES5) and Enabling Works for upgrade to Witton and Aston Rail Stations

Comprador
West Midlands Combined Authority
Publicado
2026-11-05
Plazo
No indicado
Fuentes
UK_FTS
Valor
No indicado

Descripción

La descripción está en el idioma de la fuente.

The upgrade of Witton and Aston stations was identified as a Mayoral priority in April 2025, with delivery of the interventions to be completed ahead of the UEFA Euro 2028, which nearby Villa Park Stadium is set to host four international football matches. We are now proposing to continue the development phase into Engineering Stage 5 with Network Rail and in parallel commence advanced enabling works activities ahead of a targeted completion ahead of UEFA Euro 2028. Design Development The project has proceeded through design stages ES3 and ES4 and now needs to progress to detailed design. This is Engineering Stage 5 (ES5) in Network Rail's PACE framework. Additional elements for the next design phase include Overhead Line Equipment (OLE) isolation works to minimise disruption to the network in advance of the enabling works and core construction work phases, preliminary / personnel costs, contingency, and property and planning costs associated with the Waterworks site. Enabling Works Need To achieve programme and completion in advance of UEFA Euro 2028, enabling works are required in parallel to ES5 (detailed design) development.

Suscripción

Consulte gratis el resumen de cada anuncio. Los enlaces al anuncio oficial y sus documentos, los permisos de construcción y el acceso MCP personal requieren una suscripción de pago activa.

Leer