Climate Resilience in the Water Sector of Kosovo: Seed Investment: Supply and Installation of Pump Systems
- Buyer
- Kosovo Energy Efficiency Fund
- Published
- 2026-10-20
- Deadline
- 2026-10-30T09:00:00+00:00
- Sources
- CH_SIMAP
- Value
- Not provided
Description
The description is in the source language.
<p>The Subject of the Contract is the rehabilitation and replacement of pumping equipment in existing pumping stations operated by the participating Regional Water Companies.</p><p>The Works include, but are not limited to:</p><p>— verification of hydraulic, mechanical, electrical and civil site conditions</p><p>— detailed engineering and preparation of implementation documents</p><p>— supply of pumps, motors, hydraulic equipment, valves, instrumentation, electrical and control systems</p><p>— dismantling and disposal of existing equipment as required</p><p>— installation and integration into the existing infrastructure</p><p>— testing, commissioning, trial operation and handover of the installations</p><p>The Works comprise the rehabilitation and replacement of pumping equipment at the following pumping stations:</p><p>— RWC Prishtina – Pumping Station Kodra I</p><p>— RWC Mitrovica – Pumping Stations Tuneli 1 and Staritërg</p><p>— RWC Hidrodrini – Pumping Station Jarina–Klinë</p><p>— RWC Gjakova – Pumping Station Rahoveci 1</p><p>— RWC Bifurkacioni – Pumping Station Surqinë</p><p>The Contract may include none, some or all of the selected optional pump units. Where optional pump units are included in the Contract, they shall be executed under the same contractual, technical and quality requirements as the mandatory Works.</p><p>The scope of Works and Services, technical requirements, and all other obligations of the Contractor are fully defined in the Technical Specifications the Tender Documents.</p>
CPV: 45232152
Membership
Read notice previews free of charge. Official notice and document links, construction permits and personal MCP access require an active paid membership.
Read