Tenderfy

Circulating Fluidised Bed (CFB) reactor and Heat Recovery Steam Generator (HRSG) pilot plant

Auftraggeber
Lappeenrannan-Lahden teknillinen yliopisto LUT
Veröffentlicht
2026-10-18
Frist
2026-11-10T10:00:00+00:00
Quellen
TED
Wert
Nicht angegeben

Beschreibung

Die Beschreibung ist in der Sprache der Quelle.

Detailed engineering, manufacturing, delivery, installation, testing and commissioning of a 100 kWth circulating fluidized bed (CFB) pilot plant and an attached heat recovery steam generator (HRSG). The CFB shall be capable of combustion, gasification and other reaction modes using different feedstocks and the process gases specified in the technical documentation. The HRSG, located downstream of the CFB, shall operate as a once-through unit for steam generation and hot-gas cooling. The HRSG shall be designed and manufactured in accordance with PED 2014/68/EU using Module G conformity assessment. Detailed technical requirements, operating conditions, preliminary designs and CAD models are provided in the technical annexes of the Call for Tender. The selected tenderer may display its company name on the delivered CFB and HRSG test rigs.

CPV: 38000000

Mitgliedschaft

Vorschauen sind kostenlos. Links zu offiziellen Bekanntmachungen und Dokumenten, Baugenehmigungen und persönlicher MCP-Zugang erfordern eine aktive kostenpflichtige Mitgliedschaft.

Lesen